The Final EIS is split into 10 Volumes;

Volume 1 presents an overview of the proposed actions, alternatives, and the changes that have occurred between the Draft and Final EIS.

Volume 2 analyzes the effects of the proposed facilities and infrastructure to accommodate the Marine Corps relocation to Guam, including the associated training and operations on Guam.

Volume 3 analyzes the effects of the proposed facilities and infrastructure for the Marine Corps to support operations and training on Tinian in the CNMI.

Volume 4 analyzes the effects of the Navy’s proposed deep-draft port with shoreside improvements creating a new capability in Apra Harbor, Guam, to support a transient nuclear-powered aircraft carrier.

Volume 5 analyzes the proposed site and actions of the Army’s Air and Missile Defense Task Force.

Volume 6 evaluates related actions such as utilities and roadway projects on Guam.

Volume 7 summarizes the best management practices, potential mitigation measures, and preferred alternatives’ impacts from Volumes 2 through 6. In addition, Volume 7 includes an assessment of cumulative impacts.

Volume 8 presents other environmental and regulatory considerations that were evaluated and addressed.

Volume 9 is the appendix for the entire document.

Volume 10 presents comments that were received through the public involvement process, as well as responses to those comments. Volume 10 also provides a summary of the most frequent, common themes from comments received during the public comment period and actions taken to address those common themes in the Final EIS.